Where should wash basins be placed on a construction site?

AOnly inside the site office
BAt the far end of the site, away from the welfare cabin
CNext to the skips, so waste can be rinsed off
DNext to the toilets ✓

Answer & explanation

The correct answer is Next to the toilets.

HSE says wash basins with hot and cold (or warm) running water should be next to the toilets, with soap and towels or hand dryers.