Manual Handling
Which of these reduces the need to handle heavy bags of cement on site?
ACarrying two bags at once so there are fewer trips
BStacking the bags higher so they take up less space
CMoving the bags at the start of the day when you are fresh
DUsing pre-mixed mortar, a silo mixer or a concrete pump ✓
Answer & explanation
The correct answer is Using pre-mixed mortar, a silo mixer or a concrete pump.
HSE suggests using pre-mixed mortar, a batch mix silo, or concrete pumps or trucks instead of mixing on site, so far less heavy material needs carrying by hand.
This is one of 961 free CSCS test practice questions on Pass the Site Test. It is from the topic Manual Handling and covers controls, cement. Every question is our own, written from UK health and safety law and HSE guidance. Browse all questions or take a free mock test.
mediumcontrolscement