Skip to main content

πŸ“‹

ECS Mock Test 20

50 questions Β· 30 minutes Β· Pass mark: 43/50

Other Tests
Questions in this test (50)View all β†’
1

When must welfare facilities on site be provided?

Legal Duties and Site Management

2

A survey has been done on a building. Can you assume there is no asbestos left anywhere?

Hazardous Substances and Dust

3

Under CDM 2015, what must happen to the site's emergency arrangements once they are set up?

Fire Prevention and Control

4

Who should put up (erect) a construction hoist?

Lifting Operations

5

Why do some contractors ban rigger boots on their sites?

Personal Protective Equipment

6

Why should you never wedge open a self-closing fire door?

Fire Prevention and Control

7

You need to put a heavy load in an exact position. What does HSE suggest?

Manual Handling

8

Under the Work at Height Regulations, what should be considered first?

Working at Height

9

When standing in wet concrete, how should you wear your trousers and boots?

Hazardous Substances and Dust

10

If a risk assessment shows you need PPE, who pays for it?

Personal Protective Equipment

11

Where do you find the maximum safe height for a mobile tower scaffold?

Working at Height

12

What does HSE say about working on live electrical equipment?

Electrical Safety

13

What should you do before lifting a load?

Manual Handling

14

How can a fire start on site from something as small as a spark?

Fire Prevention and Control

15

Lifting equipment is not designed for lifting people but might be used for it by mistake. What does LOLER require?

Lifting Operations

16

When counting the days a worker is off after an accident for RIDDOR, is the day of the accident included?

Accidents, Emergencies and First Aid

17

Which is the most preferred option in the waste hierarchy?

Environmental Awareness and Waste

18

Is walking up and down a permanent staircase in a building classed as work at height?

Working at Height

19

Which tools does HSE recommend for construction sites to reduce the risk of electric shock?

Electrical Safety

20

Your cables pass through a wall that already has fire-stopping. You have to remove some to fit them. What must happen?

Fire Prevention and Control

21

Under RIDDOR, what is a "dangerous occurrence"?

Accidents, Emergencies and First Aid

22

When you prove a circuit is dead, what do you check first?

Electrical Safety

23

Where should escape routes on site lead to?

Fire Prevention and Control

24

Which of these does PUWER require of work equipment?

Tools and Work Equipment

25

A dumper driver offers you a lift across site, sitting on the side of the skip. What should you do?

Safe Behaviour on Site

26

Why does it matter if a hole for a service through a fire wall is not sealed?

Fire Prevention and Control

27

Your harness webbing looks frayed when you check it at the start of the shift. What is the safest action?

Safe Behaviour on Site

28

How can planning deliveries reduce manual handling on site?

Manual Handling

29

What is a fire compartment in a building?

Fire Prevention and Control

30

Where the employer must provide PPE, what else must they provide?

Personal Protective Equipment

31

What is your legal duty as a worker when working at height?

Working at Height

32

Which of these is a main hazard of lifting operations on site?

Lifting Operations

33

Why does HSE say hard hats should be bought from a reputable supplier?

Personal Protective Equipment

34

While drilling into an old wall, dust from an unusual board appears. You are not sure what it is. What is the safest action?

Safe Behaviour on Site

35

What is the main duty of every employer under the Health and Safety at Work etc. Act 1974?

Legal Duties and Site Management

36

An electrician was badly shocked because a supply had not been properly isolated. Under which law was the company prosecuted, as well as the Health and Safety at Work Act?

Electrical Safety

37

What does HSE say causes most non-fatal injuries in construction?

Manual Handling

38

Japanese knotweed is growing on a site. What is the landowner's main legal duty?

Environmental Awareness and Waste

39

What does HSE say parking areas should be like?

Site Vehicles and Mobile Plant

40

On a building site, what colour are 110V leads, plugs and sockets usually?

Electrical Safety

41

Before you use a voltage tester to check a circuit is dead, what must you be sure of?

Electrical Safety

42

You suspect the company collecting your waste is dumping it illegally. What does GOV.UK say?

Environmental Awareness and Waste

43

A substantial part of a scaffold more than 5 metres high collapses. Nobody is hurt. Is it reportable under RIDDOR?

Accidents, Emergencies and First Aid

44

How should fragile rooflights be protected?

Working at Height

45

What is the aim of the COSHH Regulations?

Hazardous Substances and Dust

46

Can an old building be demolished by setting fire to it?

Fire Prevention and Control

47

The air in a confined space may have too little oxygen. What does HSE say must be done?

Excavations and Confined Spaces

48

On larger projects, what system can help manage the fire risk from hot work?

Fire Prevention and Control

49

Materials have been dumped in an emergency escape route to save space. What should you do?

Safe Behaviour on Site

50

A trailer is being left parked on site. Is it enough to rely on the towing vehicle's brakes?

Site Vehicles and Mobile Plant