Excavations and Confined Spaces
Under CDM 2015, what must be prevented where necessary at the edge of an excavation?
AWorkers having their breaks within sight of the excavation
BThe excavation being seen from the road
COverloading by equipment or materials ✓
DRainwater landing on the spoil heap
Answer & explanation
The correct answer is Overloading by equipment or materials.
Regulation 22 says that, where necessary, suitable steps must be taken to prevent an excavation, or any part of the ground next to it, being overloaded by work equipment or material.
This is one of 961 free CSCS test practice questions on Pass the Site Test. It is from the topic Excavations and Confined Spaces and covers excavations, loading. Every question is our own, written from UK health and safety law and HSE guidance. Browse all questions or take a free mock test.
mediumexcavationsloading
Test yourself on this topic
Earn XP and track your progress
Practice Tests
More questions on this topic
What does HSE say should be considered at the design stage because it can remove the need for major excavations?A confined space was checked and found safe yesterday. Can you assume it is safe today?What information should a commercial client give contractors before excavation work begins?Liquid or gas could flood into a confined space while someone is inside. What does HSE say to check?