What level of respiratory protection does HSE recommend for soft strip demolition?

Hazardous Substances and Dust

2

When is a burn a specified injury under RIDDOR?

Accidents, Emergencies and First Aid

3

Which parts of a structure does HSE say to remove first?

Legal Duties and Site Management

4

What happens to pedestrians most often in workplace transport accidents?

Site Vehicles and Mobile Plant

5

How much notice does HSE say to give the local authority before starting demolition?

Legal Duties and Site Management

6

You are walking across site and a marked pedestrian route goes the long way round. What should you do?

Site Vehicles and Mobile Plant

7

Which of these can noise-induced hearing loss cause?

Noise and Vibration

8

What should you do before lifting a load?

Manual Handling

9

Can you be hurt by an overhead power line without touching it?

Electrical Safety

10

You have worked on many sites before and are starting on a new one. What does HSE say workers must do on every site?

Safe Behaviour on Site

11

When must welfare facilities on site be provided?

Legal Duties and Site Management

12

What does CDM regulation 20 say about the arrangements for demolition?

Legal Duties and Site Management

13

Which of these does PUWER require of work equipment?

Tools and Work Equipment

14

Does PUWER apply to tools that workers bring in from home to use at work?

Tools and Work Equipment

15

Which of these amputations is a specified injury under RIDDOR?

Accidents, Emergencies and First Aid

16

Which precautions does HSE list for hot work?

Fire Prevention and Control

17

Your supervisor asks you to use a machine you have never been trained on, to help finish the job today. What is the safest response?

Safe Behaviour on Site

18

A worker is off for 5 days after an accident. What does RIDDOR require?

Accidents, Emergencies and First Aid

19

What does "work at height" mean?

Working at Height

20

What should never be exceeded when using lifting machinery or accessories such as chains and slings?

Lifting Operations

21

Why must an area be vacated during a refurbishment and demolition survey?

Hazardous Substances and Dust

22

Which lifting equipment should you use?

Lifting Operations

23

When is the dust risk from soft strip demolition higher?

Hazardous Substances and Dust

24

How many first-aiders must there be on a site?

Accidents, Emergencies and First Aid

25

If danger cannot be fully prevented during demolition, what does CDM regulation 20 require?

Legal Duties and Site Management

26

Which of these is part of an employer's general duty under the Health and Safety at Work Act?

Legal Duties and Site Management

27

During your induction you were told where the fire point is. When you check, the extinguisher is missing. What should you do?

Safe Behaviour on Site

28

Which is the most preferred option in the waste hierarchy?

Environmental Awareness and Waste

29

Which of these helps protect you from Weil's disease?

Health and Welfare

30

The jib of your machine has touched an overhead power line. What should you do first?

Electrical Safety

31

What must be in place before anyone enters a confined space?

Excavations and Confined Spaces

32

If hazardous manual handling can't be avoided, what must the employer do?

Manual Handling

33

Which diseases can breathing asbestos fibres cause?

Hazardous Substances and Dust

34

A hazard pictogram shows a gas cylinder. What does it warn you about?

Hazardous Substances and Dust

35

What does HSE say about portable chemical toilets on site?

Health and Welfare

36

How can a fire start on site from something as small as a spark?

Fire Prevention and Control

37

What is your legal duty as a worker when working at height?

Working at Height

38

What is a hearing protection zone?

Noise and Vibration

39

What does HSE say about cleaning site toilets?

Health and Welfare

40

Which of these tools is a common cause of hand-arm vibration?

Noise and Vibration

41

You got a small electric shock last week and weren't hurt. What does HSE say about this?

Electrical Safety

42

What is a prohibition notice?

Legal Duties and Site Management

43

Who must carry out a refurbishment and demolition asbestos survey?

Hazardous Substances and Dust

44

How should a dumper skip be loaded?

Site Vehicles and Mobile Plant

45

Why might a partly demolished floor need temporary support?

Legal Duties and Site Management

46

Where should flammable materials such as LPG ideally be stored?

Fire Prevention and Control

47

For dusty work lasting over an hour without a break, what does HSE suggest considering?

Hazardous Substances and Dust

48

Which of these is an example of a job where external, industry-recognised training is commonly used?

Tools and Work Equipment

49

A scaffold is put up around a building being demolished. Does it let you make the exclusion zone smaller?

Legal Duties and Site Management

50

Should an exclusion zone stay the same size for the whole demolition project?

Legal Duties and Site Management