Legal Duties and Site Management

10 questions · Adaptive

How adaptive learning works

This session is built around you. Questions you find difficult will appear more often. Questions you have already mastered are shown less. The more you practise, the smarter your sessions become.

  • → Get it right first time — +10 XP
  • → Get it right after a hint — +5 XP
  • → Every question has a full explanation

Legal Duties and Site Management

97 questions in this chapter

1

What is the main duty of every employer under the Health and Safety at Work etc. Act 1974?

Answer: To ensure, so far as reasonably practicable, the health, safety and welfare of employees

2

Which of these is part of an employer's general duty under the Health and Safety at Work Act?

Answer: Providing the information, instruction, training and supervision needed

3

What are your two general duties as an employee under the Health and Safety at Work Act?

Answer: Take reasonable care of yourself and others, and co-operate with your employer

4

A workmate removes a guard-rail to make a job quicker and doesn't put it back. Which law does this break?

Answer: The Health and Safety at Work Act, which bans interfering with safety equipment

5

What must every employer make, under the Management of Health and Safety at Work Regulations?

Answer: A suitable and sufficient assessment of the risks to employees and others affected by their work

6

When must an employer record the significant findings of their risk assessment?

Answer: When they have five or more employees

7

When must a risk assessment be reviewed?

Answer: If there is reason to think it is no longer valid, or there has been a significant change

8

Under CDM 2015, when must the client appoint a principal designer and a principal contractor?

Answer: When there is, or is likely to be, more than one contractor on the project

9

If the client fails to appoint a principal contractor when one is needed, who takes on those duties?

Answer: The client

10

Before the construction phase starts, what must be drawn up?

Answer: A construction phase plan

11

Who prepares the health and safety file for a project with more than one contractor?

Answer: The principal designer

12

When is a construction project notifiable to HSE?

Answer: If it lasts more than 30 working days with more than 20 workers at once, or exceeds 500 person days

13

Who must notify HSE about a notifiable project, and where must the notice be displayed?

Answer: The client, with the notice clearly displayed in the site office

14

Which of these is a duty of the principal contractor?

Answer: Make sure all workers have a site-specific induction

15

Who must take steps to prevent unauthorised people getting onto a construction site?

Answer: The principal contractor

16

When must welfare facilities on site be provided?

Answer: From the start of the construction phase, and maintained throughout

17

Under CDM 2015, what kind of construction work should you carry out?

Answer: Only work you have the right skills, knowledge, training and experience for

18

You notice something unsafe on site that could hurt someone else. What does CDM 2015 expect you to do?

Answer: Report it to whoever controls the work on site

19

What does HSE say workers must always do with site rules and procedures?

Answer: Always follow them

20

What must employers do about health and safety matters that affect their workers?

Answer: Consult the workers, or their representatives

21

What is a prohibition notice?

Answer: A notice from an inspector that stops a dangerous activity

22

What is an improvement notice?

Answer: A notice from an inspector requiring the dutyholder to make improvements

23

What is the most common enforcement action taken by HSE?

Answer: Giving the dutyholder advice and writing to them to require action

24

Does an employer have legal duties to people who are not its employees, such as members of the public?

Answer: Yes, so far as reasonably practicable

25

When must an employer give employees health and safety training, under the Management Regulations?

Answer: When they start, and when they face new or bigger risks

26

When must health and safety training required by the Management Regulations take place?

Answer: During working hours

27

When giving tasks to employees, what must an employer take into account?

Answer: Their health and safety capabilities

28

What information must an employer give employees about the risks found in the risk assessment?

Answer: Clear information on the risks and the controls

29

Under CDM 2015, when may a designer or contractor accept an appointment to a project?

Answer: Only if they have the skills, knowledge and experience for it

30

Under CDM 2015, who must you co-operate with on health and safety?

Answer: Others on the project or an adjoining site

31

What does CDM 2015 say about health and safety information or instructions that people must give?

Answer: They must be understandable and given as soon as reasonably practicable

32

What is the principal contractor's main duty during the construction phase?

Answer: To plan, manage and monitor it, and co-ordinate health and safety

33

Which of these must the principal contractor organise during the construction phase?

Answer: Co-operation between the contractors

34

Who must the principal contractor liaise with throughout the principal designer's appointment?

Answer: The principal designer

35

Under CDM 2015, what must a contractor give each worker under their control?

Answer: Appropriate supervision, instructions and information

36

Which of these must the information a contractor gives its workers include, under CDM 2015?

Answer: A suitable site induction, unless the principal contractor has already given one

37

A contractor wants to take someone on for a task. What does CDM 2015 say about that person?

Answer: They must have, or be getting, the skills, knowledge, training and experience needed

38

What must a contractor do with the construction work they and their workers carry out?

Answer: Plan, manage and monitor it so it is done without risks, so far as reasonably practicable

39

Before a contractor starts work on a site, what must have happened about site access?

Answer: Reasonable steps must have been taken to stop unauthorised people getting in

40

On a project with more than one contractor, whose directions must each contractor comply with?

Answer: The principal designer’s or the principal contractor’s

41

On a job with only one contractor, who must make sure a construction phase plan is drawn up?

Answer: The contractor

42

Before starting construction work, a contractor must be satisfied of what about the client?

Answer: That the client is aware of their duties under CDM 2015

43

Under CDM 2015, what must a contractor ensure about welfare facilities for their own workers?

Answer: That Schedule 2 welfare requirements are met, so far as they affect the contractor and its workers

44

A new starter did an induction on another of your firm’s sites last month. What does HSE say they need here?

Answer: A suitable induction that is specific to this site

45

Before a worker uses a mobile elevating work platform, what should their contractor check?

Answer: That they have the skills, knowledge, training and experience for it

46

Who must plan, manage, monitor and coordinate health and safety for the whole construction phase?

Answer: The principal contractor

47

Under CDM 2015, who must make sure a suitable site induction is provided on a project with a principal contractor?

Answer: The principal contractor

48

What must the principal contractor organise between the contractors on site?

Answer: Cooperation, including between contractors who follow each other on site

49

When planning how long work stages will take, what must the principal contractor take into account?

Answer: The general principles of prevention

50

How long must the principal contractor make sure welfare facilities are provided on site?

Answer: From the start and throughout the construction phase

51

When must the principal contractor prepare the written construction phase plan?

Answer: Before the construction phase begins

52

Once work has started, what should happen to the construction phase plan?

Answer: It should be put into practice, and regularly reviewed and revised

53

Under CDM 2015, when must the principal contractor consult workers about matters affecting their health, safety or welfare?

Answer: In good time, unless their employer has already consulted them

54

Under regulation 14 of CDM 2015, what can workers or their representatives ask the principal contractor for?

Answer: To inspect and copy relevant health, safety and welfare information it holds

55

Section 2 of the Health and Safety at Work Act says an employer must provide what, as needed for safety?

Answer: Information, instruction, training and supervision

56

What does section 2(3) of the Health and Safety at Work Act require most employers to do with their health and safety policy?

Answer: Write it down, revise it when appropriate, and bring it to all employees’ attention

57

When giving a worker a task, what must an employer take into account under the Management Regulations?

Answer: Their capabilities as regards health and safety

58

A worker moves to a new task using equipment they haven’t used before. What must their employer provide?

Answer: Adequate health and safety training for the new risks

59

When must health and safety training required by the Management Regulations take place?

Answer: During working hours

60

Under the Management Regulations, how often should health and safety training be repeated?

Answer: Periodically where appropriate, and updated for new or changed risks

61

Why does the law give young workers extra protection at work?

Answer: Because of their inexperience, lack of awareness of risks and immaturity

62

An apprentice (no longer a child) needs to do riskier work as part of their training. Which condition applies?

Answer: They must be supervised by a competent person, with risks reduced as low as reasonably practicable

63

One of your team has the right attitude but not yet the experience for a task. What does HSE say they need?

Answer: The training and supervision that lets them do it safely

64

HSE says construction workers must report risks they find to whom?

Answer: Whoever controls the work on site

65

How does HSE describe a permit-to-work?

Answer: A formal system stating exactly what work is to be done and when, and which parts are safe

66

Does issuing a permit-to-work make a job safe by itself?

Answer: No, the precautions still have to be put in place and checked

67

How does a permit-to-work relate to the risk assessment, according to HSE?

Answer: It helps bring the risk assessment to life, but does not replace it

68

A job under a permit-to-work can’t be finished before the end of the shift. What should happen?

Answer: It should be left in a safe state, with a proper handover

69

According to HSE, who signs a permit-to-work?

Answer: The people doing the job

70

HSE describes permits-to-work as a means of what?

Answer: Communication between site management, supervisors and the people doing the work

71

What problem does HSE warn can happen with permits at the start of a shift?

Answer: Permit overload, with too many to handle properly at once

72

HSE lists unclear roles as a common failing of permit systems. What should be clear?

Answer: Who is in charge, and who does what

73

What does CDM regulation 20 say about the arrangements for demolition?

Answer: They must be recorded in writing before the work begins

74

If danger cannot be fully prevented during demolition, what does CDM regulation 20 require?

Answer: Danger reduced as low as is reasonably practicable

75

How much notice does HSE say to give the local authority before starting demolition?

Answer: At least 6 weeks

76

Who must write the demolition method?

Answer: A competent person

77

Which regulations apply to demolition work, as they do to other construction work?

Answer: The Construction (Design and Management) Regulations 2015

78

Who plans and manages health and safety during the demolition work itself?

Answer: The principal contractor

79

When should live services below ground in the work area be identified?

Answer: Before demolition starts

80

What information about the structure must the client give the demolition contractor before work starts?

Answer: Asbestos, structural stability, past alterations and below-ground services

81

Before awarding a complex demolition contract near roads or in a town, whose advice does HSE recommend?

Answer: A competent demolition engineer

82

What sequence of work does HSE say demolition should follow?

Answer: One that removes any chance of an uncontrolled collapse

83

Which parts of a structure does HSE say to remove first?

Answer: Elements that are not critical to its stability

84

Why might a partly demolished floor need temporary support?

Answer: Debris build-up or machines on the floor add extra load

85

Who should decide whether temporary support is needed during alteration or demolition?

Answer: A qualified, experienced engineer

86

Temporary props and bracing must be designed to handle what?

Answer: All foreseeable loads

87

How should temporary bracing and propping be removed?

Answer: According to the designer's specification

88

Can a standard scaffold be used to hold up a building during demolition?

Answer: No, restraining a building needs a specialist design

89

When deciding how to prevent collapse, what should a structural survey also consider?

Answer: Any nearby buildings or structures

90

What must an exclusion zone around a demolition be big enough to do?

Answer: Keep all debris inside it if the structure collapses

91

A scaffold is put up around a building being demolished. Does it let you make the exclusion zone smaller?

Answer: No, a scaffold does not allow a smaller exclusion zone

92

Which method usually needs a smaller exclusion zone?

Answer: Top-down demolition

93

Should an exclusion zone stay the same size for the whole demolition project?

Answer: No, it may need to change as the work progresses

94

If a collapse could throw debris outside the site onto a road, what might reduce the risk?

Answer: A road closure, agreed with the highway authority

95

If there is not enough space around a structure for the exclusion zone a method needs, what does HSE suggest?

Answer: Choose a different demolition technique

96

Who should design bracing and propping during demolition?

Answer: Experienced temporary works designers

97

How does HSE suggest removing the need for workers to be at height during demolition?

Answer: Use a high-reach machine with a protected cab